Automatic Water Sampler Installation Requirements

Oct 10, 2025|

1. Requirements for site selection of instrument installation

(1) The distance between the installation point and the sampling point (water intake) should not exceed 20m. If it exceeds 20m, please declare to Party B in advance;

(2) The room power supply of the installed instrument must meet the following requirements: access to a power supply with a capacity of 500W, the power supply voltage must be within the range of 198V ~242V, and have a good grounding;

(3) Reserve two 10A five-hole sockets;

(4) The decoration should be far away from strong electromagnetic field, strong noise source and other devices with large interference;

(5) The sampling tube and related power line are buried under the ground 0.5~1.0m when laying, so as to prevent the sampling pipeline from being damaged by ground pressure and cold weather.

2. Infrastructure requirements for instrument room

1) The cement instrument room foundation shall be built according to the installation requirements of standard instrument room, and the area shall not be less than 12m2;

2) The power line is embedded in the room;

3) The foundation of the instrument room should be embedded with a grounding resistance less than 4Ω;

4) The instrument room is embedded with inlet pipeline and drainage pipe, the diameter of inlet pipeline is not less than 25mm, and the diameter of drainage pipe is not less than 25mm;

5) The temperature in the station room should be 0-40℃, without rain leakage;

6) When connected to the external waterway, ensure that the water pressure of the external water source is zero.

Special statement: if you install the equipment under the basic conditions that are not required for the operation of the instrument, the failure rate of the instrument will increase and the service life of the instrument will be reduced. Please handle it carefully!

WPS0.png


FAQ

Q1:Where are automatic water samplers used?

A1:The automatic water sampler is suitable for environmental protection departments, sewage treatment plants, drainage management offices, sewage discharge enterprises to automatically collect and refrigerate water samples of surface water, water treatment process and total sewage outlet of enterprises.

 

Q2:Where is your company?

A2:No.8 Guangdian Road,Development Zone,Nantong City,Jiangsu Province.